Skip to content

Implement shaped proposal 202401: Presenting our Strategy #1048

@elisapaka

Description

@elisapaka

An issue for implementing the shaped proposal 202401 "Presenting our Strategy".

Summary of shaped proposal

  • Appetite: 3d (reduced by 1d given we spent 1.5d in shaping and work we did in shaping will help)
  • Problem: lot of strategy-related materials but they aren't woven together or consolidated which creates a sense of overwhelm and confusion and prevents them being published and used.
  • Solution: inventory materials, create framework to organize them, create roadmap for publication. If we can, start on consolidated strategy.

Acceptance

  • A complete inventory of existing materials related to Life Itself strategy (V2 and V3) in the strategy repo ✅2024-02-23 this got complete.
  • A framework for organising materials ✅2024-02-25 we kind of have that in the structure
  • Most important materials are organised according to the framework in a visual map or similar ✅2024-02-25 have that in excalidraw image
  • A roadmap for publishing the consolidated strategy (e.g. in the form of a DAG of recommended outputs with estimates)
  • Bonus: Sketch of long-form consolidated v3 strategy
  • Bonus: Consolidated v2 strategy

Tasks

Misc

  • Have we included the brand documents Yes - we have brand narrative 2020, and brand narrative 2022)
  • More generally have we gone through entire strategy v3 folder in drive and processed everything (either decided it's worthy of inclusion or not - probably worth having that checklist somewhere with brief notes either way e.g. Inbox page in strategy repo or similar. BONUS: deleting / archiving / deprecating stuff in that folder)
    • Is this (+going through everything in drive) crossing into a rabbit hole of looking for materials we ever produced on this? this isn't everything, just that specific folder
  • Strategy wiki: what is the 'Oct 2021 Consolidated List of Materials'? ✅2024-02-27 explained this.
    • What do the 3rd and 4th columns represent? Hypothesis: 4th column is notes - 3rd column I don't have a guess for!
  • What is "Multiple why levels issue 36 Sep 2021"?

Metadata

Metadata

Assignees

Labels

No labels
No labels

Type

No type

Projects

Status

✅ Done

Milestone

No milestone

Relationships

None yet

Development

No branches or pull requests

Issue actions